TEC 야후 유저그룹에 퍼온 글입니다..TEC의 Yuri씨가 직접 올린 TEC제품
들에 대한 최근 소식이군요.참고 하세요..결국 일손이 모자라서 제품공급이
늦다고 하소연을 하는군요..그래두 AP보단 양호한듯 합니다..
우리 나다회원분 중에도 가입하신 분이 보이더군요...ㅎㅎ

12" MAK:
In May we have finished a few sets and were not satisfied with optics that in
all
cases had signs of similarity of wave front pattern when tested not in
autocollimation, in autocollimation all sets were fine..? We found that the
problem was in the test flat that was done for this project. We have done this
mirror usual way with test flats of smaller size as we did before but smaller
flats. But for 14" flat this test was not sencitive enough to detect such
error as
small astigmatism and residual spherical abberation. The other addition test
method is needed - such as testing flat mirror with a precision shpere in
autocollimation - method of A.Common. The precision shepical mirror was
done last month and now Ed is completing the flat, at the same time he did
touch ups on all meniscuses, that were done in May. So far this is the most
complicated project, but will be done.
10" MAKs
- all delayed because of above project, also we were not quite satisfied with
new Quartz source, that was given us microbubbles on surfaces - Quartz for
this size and 8" MAKs was purchased from other source (and errived already).
All 10" MAK current orders will be done in new design, that will let use
electrical focusing or cooling system.
8" MAKs
- all old style models were completed last week.
Optics for new design models will be done in September.
6" MAK - same situation as for 8" and 10" models .
Counting all above we currently do not take orders for MAKs until all optics
are completed for orders in work. And after that we will do MAKs only through
a waiting list, that let us accumulate a certain number of orders that is
nessasary for the production run. Otherwise we can not do them on the order
base as before counting huge demand for APOs (more than 100 to be made
in next 18 months.
APO140 - this goes much better (even we have recieved third glass later than
was sheduled) and first 10 will be shipped next week and 10 more to the end
of month.
APO200ED f/9 - all glass has been received and successfully tested -
finishing tooling and test plates according to given refractive indexes of
glasses (they are as usual a bit different than from catalog numbers).
APO200FL F8 - Waiting for CaF2, that should be here in a short time, all other
glasses on shelf and all tolls and test plates.
APO160ED f/8 - glasses choosen, design completed - production will start
after thrid run of APO140 - in 2004. Can supply on a special order base the
APO160 Fluorite.
APO180 f/? - we have design for f/8, but trying to make it f/7... - not easy;
production will be done at the same time as APO160.
The Eyepiece Turret - we dont have enough orders (a min 100 is needed) for
this unit and shifted production of mechanical components to October
completion - at the Christmass time this unit will go much faster. Optics is
completed (>100 flat mirrors). Prototype unit also was tested under the sky
and works the way you will not be able to escape this accessory.
I am sorry for all of our customers for delaying their scopes. We are trying to
be better in delivery and avoid waiting list at least for refractors, two more
people were added to the company stuff this year, but we still have shortage
of hands...
Best regards, Yuri

자유 게시판

자유롭게 작성해 주세요. 예의는 기본 입니다.

List of Articles
번호 제목 글쓴이 날짜 조회 수
공지 로그인 문제는 즐겨찾기 주소 확인 부탁드립니다. 5 최승용 2015.04.14 513
공지 [공지] 게시판 이용방법 *** 3 NADA 2004.08.23 10629
169 80미리급 굴절경통 구합니다. 지승용 2005.04.15 1691
168 7월29일 NadA 출석부 13 file 이건호 2005.07.29 1564
167 7월26일 시원한 출석부 5 file 이건호 2005.07.26 1499
166 7월22일 출근부~ 9 file 박성래 2005.07.22 1393
165 7월1일 출석부. M51에 초신성 발견 10 이건호 2005.07.01 1507
164 7월 첫째주 이주의 천체사진은... 13 박영식 2006.07.03 1640
163 7월 마지막날 관측일지 2 송준엽 2006.08.01 1736
162 7월 7일 출근부... 11 file 박영식 2005.07.07 1738
161 7월 6일 출근부... 9 file 박영식 2005.07.06 1591
160 7월 5일 출근부... 5 file 박영식 2005.07.05 1485
159 7월 4일 출근부... 12 file 박영식 2005.07.04 1447
158 7월 25일 월요일 출근부... 15 박영식 2005.07.25 1548
157 7월 22일 목요포름 file 추현석 2004.07.23 1579
156 7월 21일 출근부... 14 file 박영식 2005.07.21 1313
155 7월 18일입니다. - 이주의 천체사진에 최승용님의 크레이터 사진이 올라왔습니다. 17 file 이건호 2005.07.18 1554
154 7월 13일 관측 감사드림 2 이은주 2003.07.14 1731
153 7월 12일 출근부... 8 file 박영식 2005.07.12 1591
152 7월 11일 월요일... 출근부... 10 박영식 2005.07.11 1357
151 7/29 오리온 경통으로 관측 하셨던 분.. 지승용 2003.07.30 1821
150 6월 마지막주 이주의 천체사진은... 9 박영식 2006.06.26 1541
Board Pagination Prev 1 ... 86 87 88 89 90 91 92 93 94 95 ... 99 Next
/ 99

NADA. Network of Amatuer Digital Astrography © Since 2003, All Rights Reserved

Design ver 2.0 / Google Chrome 에 최적화 되어 있습니다.

sketchbook5, 스케치북5

sketchbook5, 스케치북5

나눔글꼴 설치 안내


이 PC에는 나눔글꼴이 설치되어 있지 않습니다.

이 사이트를 나눔글꼴로 보기 위해서는
나눔글꼴을 설치해야 합니다.

설치 취소