Skip to content

2003.08.13 14:43

TEC Update..

(*.251.197.105) 조회 수 1923 댓글 1
?

단축키

Prev이전 문서

Next다음 문서

크게 작게 위로 아래로 댓글로 가기 인쇄 수정 삭제
?

단축키

Prev이전 문서

Next다음 문서

크게 작게 위로 아래로 댓글로 가기 인쇄 수정 삭제

TEC 야후 유저그룹에 퍼온 글입니다..TEC의 Yuri씨가 직접 올린 TEC제품
들에 대한 최근 소식이군요.참고 하세요..결국 일손이 모자라서 제품공급이
늦다고 하소연을 하는군요..그래두 AP보단 양호한듯 합니다..
우리 나다회원분 중에도 가입하신 분이 보이더군요...ㅎㅎ

12" MAK:
In May we have finished a few sets and were not satisfied with optics that in
all
cases had signs of similarity of wave front pattern when tested not in
autocollimation, in autocollimation all sets were fine..? We found that the
problem was in the test flat that was done for this project. We have done this
mirror usual way with test flats of smaller size as we did before but smaller
flats. But for 14" flat this test was not sencitive enough to detect such
error as
small astigmatism and residual spherical abberation. The other addition test
method is needed - such as testing flat mirror with a precision shpere in
autocollimation - method of A.Common. The precision shepical mirror was
done last month and now Ed is completing the flat, at the same time he did
touch ups on all meniscuses, that were done in May. So far this is the most
complicated project, but will be done.
10" MAKs
- all delayed because of above project, also we were not quite satisfied with
new Quartz source, that was given us microbubbles on surfaces - Quartz for
this size and 8" MAKs was purchased from other source (and errived already).
All 10" MAK current orders will be done in new design, that will let use
electrical focusing or cooling system.
8" MAKs
- all old style models were completed last week.
Optics for new design models will be done in September.
6" MAK - same situation as for 8" and 10" models .
Counting all above we currently do not take orders for MAKs until all optics
are completed for orders in work. And after that we will do MAKs only through
a waiting list, that let us accumulate a certain number of orders that is
nessasary for the production run. Otherwise we can not do them on the order
base as before counting huge demand for APOs (more than 100 to be made
in next 18 months.
APO140 - this goes much better (even we have recieved third glass later than
was sheduled) and first 10 will be shipped next week and 10 more to the end
of month.
APO200ED f/9 - all glass has been received and successfully tested -
finishing tooling and test plates according to given refractive indexes of
glasses (they are as usual a bit different than from catalog numbers).
APO200FL F8 - Waiting for CaF2, that should be here in a short time, all other
glasses on shelf and all tolls and test plates.
APO160ED f/8 - glasses choosen, design completed - production will start
after thrid run of APO140 - in 2004. Can supply on a special order base the
APO160 Fluorite.
APO180 f/? - we have design for f/8, but trying to make it f/7... - not easy;
production will be done at the same time as APO160.
The Eyepiece Turret - we dont have enough orders (a min 100 is needed) for
this unit and shifted production of mechanical components to October
completion - at the Christmass time this unit will go much faster. Optics is
completed (>100 flat mirrors). Prototype unit also was tested under the sky
and works the way you will not be able to escape this accessory.
I am sorry for all of our customers for delaying their scopes. We are trying to
be better in delivery and avoid waiting list at least for refractors, two more
people were added to the company stuff this year, but we still have shortage
of hands...
Best regards, Yuri

자유 게시판

자유롭게 작성해 주세요. 예의는 기본 입니다.

List of Articles
번호 제목 글쓴이 날짜 조회 수
공지 로그인 문제는 즐겨찾기 주소 확인 부탁드립니다. 5 최승용 2015.04.14 515
공지 [공지] 게시판 이용방법 *** 3 NADA 2004.08.23 10631
1968 5월5일 새벽 분당 강남300CC주차장 1 file 이건호 2004.05.04 26707
1967 리듀서 필터 사경등 여러가지팝니다. 4 file 이건호 2007.04.21 21066
1966 박성래님 수고하셨습니다. 이준화 2003.04.05 12487
1965 Comet Machholz Finder Chart(041220-050119) file 염범석 2004.12.16 8758
1964 히터 발열량(김응수님 질문에 대한 답변) 9 file 박병우 2003.07.27 8406
1963 (제품정보) 로즈만디 HGM Titan 마운트 가격쎄일 7 file 김영재 2004.10.18 7912
1962 별지시기 분해및 튜닝하다 10 file 김준호 2005.02.10 6420
1961 050725_한일 아마추어 모임 1 file 최승용 2005.07.26 6393
1960 미국 아스트로마트에 AP망원경이 2 이건호 2004.08.17 5753
1959 행성의 정의에 대하여 토론 성대환 2005.10.07 5648
1958 대구경 대신 광증폭기를 사용하여 딥스카이 보기? 27 김청민 2004.06.26 5643
1957 [re] 050725_한일 아마추어 모임 4 file 이경화 2005.07.27 5571
1956 소행성위치 계산 3 성 대환 2004.04.30 5189
1955 편리한 단위 환산(2)/ 옥이에게 또 잔소리 2 박병우 2003.08.21 5094
1954 [re] 050725_한일 아마추어 모임 6 file 최승용 2005.07.27 4937
1953 카메라용 망원 렌즈와 천체 망원경의 화질 비교 6 file 박병우 2004.12.28 4835
1952 경도, 위도 입력시 주의사항/ 편리한 단위 환산법 5 file 박병우 2003.08.19 4785
1951 망원경 손잡이 이야기 7 박병우 2003.07.14 4753
1950 18 회 스타파티 안내 10월 28일 NADA 2006.10.24 4748
Board Pagination Prev 1 2 3 4 5 6 7 8 9 10 ... 99 Next
/ 99

NADA. Network of Amatuer Digital Astrography © Since 2003, All Rights Reserved

Design ver 2.0 / Google Chrome 에 최적화 되어 있습니다.

sketchbook5, 스케치북5

sketchbook5, 스케치북5

나눔글꼴 설치 안내


이 PC에는 나눔글꼴이 설치되어 있지 않습니다.

이 사이트를 나눔글꼴로 보기 위해서는
나눔글꼴을 설치해야 합니다.

설치 취소