TEC 야후 유저그룹에 퍼온 글입니다..TEC의 Yuri씨가 직접 올린 TEC제품
들에 대한 최근 소식이군요.참고 하세요..결국 일손이 모자라서 제품공급이
늦다고 하소연을 하는군요..그래두 AP보단 양호한듯 합니다..
우리 나다회원분 중에도 가입하신 분이 보이더군요...ㅎㅎ

12" MAK:
In May we have finished a few sets and were not satisfied with optics that in
all
cases had signs of similarity of wave front pattern when tested not in
autocollimation, in autocollimation all sets were fine..? We found that the
problem was in the test flat that was done for this project. We have done this
mirror usual way with test flats of smaller size as we did before but smaller
flats. But for 14" flat this test was not sencitive enough to detect such
error as
small astigmatism and residual spherical abberation. The other addition test
method is needed - such as testing flat mirror with a precision shpere in
autocollimation - method of A.Common. The precision shepical mirror was
done last month and now Ed is completing the flat, at the same time he did
touch ups on all meniscuses, that were done in May. So far this is the most
complicated project, but will be done.
10" MAKs
- all delayed because of above project, also we were not quite satisfied with
new Quartz source, that was given us microbubbles on surfaces - Quartz for
this size and 8" MAKs was purchased from other source (and errived already).
All 10" MAK current orders will be done in new design, that will let use
electrical focusing or cooling system.
8" MAKs
- all old style models were completed last week.
Optics for new design models will be done in September.
6" MAK - same situation as for 8" and 10" models .
Counting all above we currently do not take orders for MAKs until all optics
are completed for orders in work. And after that we will do MAKs only through
a waiting list, that let us accumulate a certain number of orders that is
nessasary for the production run. Otherwise we can not do them on the order
base as before counting huge demand for APOs (more than 100 to be made
in next 18 months.
APO140 - this goes much better (even we have recieved third glass later than
was sheduled) and first 10 will be shipped next week and 10 more to the end
of month.
APO200ED f/9 - all glass has been received and successfully tested -
finishing tooling and test plates according to given refractive indexes of
glasses (they are as usual a bit different than from catalog numbers).
APO200FL F8 - Waiting for CaF2, that should be here in a short time, all other
glasses on shelf and all tolls and test plates.
APO160ED f/8 - glasses choosen, design completed - production will start
after thrid run of APO140 - in 2004. Can supply on a special order base the
APO160 Fluorite.
APO180 f/? - we have design for f/8, but trying to make it f/7... - not easy;
production will be done at the same time as APO160.
The Eyepiece Turret - we dont have enough orders (a min 100 is needed) for
this unit and shifted production of mechanical components to October
completion - at the Christmass time this unit will go much faster. Optics is
completed (>100 flat mirrors). Prototype unit also was tested under the sky
and works the way you will not be able to escape this accessory.
I am sorry for all of our customers for delaying their scopes. We are trying to
be better in delivery and avoid waiting list at least for refractors, two more
people were added to the company stuff this year, but we still have shortage
of hands...
Best regards, Yuri

자유 게시판

자유롭게 작성해 주세요. 예의는 기본 입니다.

List of Articles
번호 제목 글쓴이 날짜 조회 수
공지 로그인 문제는 즐겨찾기 주소 확인 부탁드립니다. 5 최승용 2015.04.14 513
공지 [공지] 게시판 이용방법 *** 3 NADA 2004.08.23 10629
169 뮤론210을 찾습니다. 1 박성근 2012.06.09 1706
168 2013년 천체사진전이 발표 6 이건호 2013.05.05 1072
167 이미지처리 워크샵 22 이건호 2013.05.22 1190
166 프레임 뉴튼 경통완성 2 file 이준화 2013.05.30 858
165 2013년도 NADA 웍샵 관련 공지 1 2 NADA 2013.06.24 1141
164 20년된 필름으로 찍으면? 3 file 이준희 2013.06.25 1322
163 웍샵 일반회원 신청받습니다. <-여기에 댓글로 신청바랍니다. 27 NADA 2013.07.01 4113
162 2013 NADA Image Processing Workshop 공지 2 2 file NADA 2013.07.04 789
161 2013 NADA Image Processing Workshop 공지 3 5 file 박영식 2013.07.08 723
160 정회원 가입신청 이건호 2013.07.08 838
159 [re] 정회원 가입신청 2 NADA 2013.07.11 872
158 어휴 8 이건호 2013.07.17 775
157 [전시회]2013 별하늘지기 천체사진 전시회 1 file 안해도 2013.07.21 754
156 망원경 찾아 5천리 4 공석환 2013.08.13 950
155 최승룡님 모친상 11 황인준 2013.08.16 992
154 Clear sky 5 공석환 2013.08.21 704
153 Dark Sky 2 공석환 2013.09.11 633
152 (번개취소)오랜만에 번개 올려봅니다. 4 변성식 2013.09.16 986
151 Canon 200mm F2.8 Lens를 이용한 와이드필드 이미징 3 공석환 2013.10.10 871
150 사이렌의 유혹 5 공석환 2013.10.13 1119
Board Pagination Prev 1 ... 86 87 88 89 90 91 92 93 94 95 ... 99 Next
/ 99

NADA. Network of Amatuer Digital Astrography © Since 2003, All Rights Reserved

Design ver 2.0 / Google Chrome 에 최적화 되어 있습니다.

sketchbook5, 스케치북5

sketchbook5, 스케치북5

나눔글꼴 설치 안내


이 PC에는 나눔글꼴이 설치되어 있지 않습니다.

이 사이트를 나눔글꼴로 보기 위해서는
나눔글꼴을 설치해야 합니다.

설치 취소